Squadron Operations: Summary Information

Overview

There follows below a list of the all of the operations flown by 550 Squadron and the aircraft involved on each. The information used to build this page was taken in the first instance from the lists provided on the original Squadron Association web-site, but has been augmented by new information gathered since that time (squadron operations logs, individual aircrew log books, and other sources).

This information is not yet complete: it has been build from the a number of sources (documentary and people) and compilation of complete lists is an ongoing task that is expected to take quite some time to complete. So please don't shout just yet if you spot an omission - work continues to build a more complete, and accurate, list.
Do however shout if you spot an error! Please email any corrections or information to the contact details in the link at the bottom of the page.

Operation Summary: The column headers should be fairly self-explanatory. The term "aborted" as used here covers a number of possibilities:

Aircraft Deployed: When a link to a particular aircraft is given, this indicates aircraft known to have taken part in this raid (in the records currently available to the web-site author). A record of whether the aircraft returned or failed to return (FTR) is also logged.

Servicemen Deployed: Names of the crew in the operation.

Station Summary: This section is the information from the RAF North Killingholme Station Record Book for the operational date (if available).

Definitions of the abbreviations used are available: here.

Manageable Lists

The amount of data in the database is growing and this is resulting in the "all operations/targets" list getting rapidly bigger and thus slower to generate. There are options to display shorter, more quickly generated, reports if you want to home in on something specific. For example, there are options to generate reports on operations to a single target, or by single aircraft (to all targets) or by single aircraft to a single target. There is, on the database-reports summary page, a short user guide (PDF format) on how to do this.


Operation/Target: Gelsenkirchen (06 Nov 1944 - 06 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Gelsenkirchen 06 Nov 1944 06 Nov 1944 N Twenty three aircraft with crews took off at approximately 11.00hrs to attack GELSINKIRCHEN 7 miles NE of Essen. The object of this attack was to dislocate the Huns transport facilities by bombing the very large marshalling yards. The weather at the target was 6/10 - 8/10 cloud with a convenient gap for the early arrivals who were able to identify the target area visually, as well as see a few TI markers, marking the A/P. The attack opened a few minutes early, but the later aircraft found the cloud rather too much for accurate bombing and with the M/C giving them instructions to seek their own A/Ps the end of the attack became somewhat scattered. However a good concentration of early bombs were dropped around the A/P and much smoke and later incendiaries with the large fires burning were seen. Flak was moderate to intense throughout the route through the Ruhr, from Duisburg onwards, although it varied greatly as to different aircraft: "E" (F/O Whynacht) receiving flak damage in the fuselage, bomb doors and two radiators. No enemy aircraft were seen, so the figher cover appeared to be adequate. "H" (F/O Bond) found he had no brake pressure on retun so landed without trouble at Carnaby. "M" (F/O McCarthy) did not return and no news was received from him after take off.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary, at 19,500 ft. at 13.58 F/L E S Allen (P)
F/Sgt E T Smith (F/Eng)
F/Sgt A B Dennison (Nav)
F/Sgt G A Maginley (A/B)
F/Sgt R W Lundie (W/Op)
Sgt R G Crump (MU/AG)
F/O J E Murray-Shirreff (R/AG)

Operation/Target: Wanne-Eikel (09 Nov 1944 - 09 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Wanne-Eikel 09 Nov 1944 09 Nov 1944 N 23 aircraft and crews from 550 Squadron together with one aircraft from each of 166 and 103 Sqdns took off at approximately 07.20hrs to attack the synthetic oil plant at WANNE-EIKEL 2.5 miles NW of Bochum one of the lesser known towns of the Ruhr but nevertheless important since it forms part of the general Ruhr network of railway and marshalling yards. The take-off was good as was the weather up to the French coast after which the crews encountered cloud banks and when the target area was reached there was thick cumulous at 20,000 ft with layer cloud below. Only one aircraft E2 (F/O Stevenson) had a fleeting glimpse of the target, and but for navigational aids the raid would have dissolved itself into a veritable blind mans buff. With such conditions existing it is impossible to assess the success or otherwise of the operation. Flak was scattered and erratic, and the fighter cover of Spitfires and Mustangs kept enemy fighters out of harms way. All our aircraft returned safely and the boys enjoyed a late lunch.
Station Summary
OPERATIONS
At first light 25 aircraft took off from NORTH KILLINGHOLME (comprising 23 of 550 Squadron and 1 of 166 Squadron and 1 of 103 Squadron, the latter having landed here from training) to attack WANNE-EICKEL, as part of a No. 1 Group force of 233 aircraft. All out aircraft returned safely having claimed to have bombed the target.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary, at 22,000 ft at 10.44

Operation/Target: Wanne-Eikel (18 Nov 1944 - 19 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Wanne-Eikel 18 Nov 1944 19 Nov 1944 N The Squadron dispatched 29 aircraft and crews at approximately 15.30hrs to attack a synthetic oil plant at WANNE-EIKEL west of Gelsenkirchen. Soon after take off the crews encountered cloudy weather over England which however cleared across France; shortly after crossing the Rhine a thin layer of stratus cloud with tops at approximately 8000 ft and similiar conditions prevailed over the target area. Although few crews were able to see ground details, the cloud was thin enough for the markers to show through and for the most part a concentrated supply of them was available. Bombing was reported to have been well concentrated around the markers and very early in the attack a large fire developed which, from the column of black smoke which arose it would seem likely that the oil plant was successfully hit. Numerous orange coloured explosions were seen during the course of the attack two which occured at 19.20 and 19.23 must have been particularly large as some of the crews clearly saw the glow when 40 miles away in the homeward journey. Flak was reported to be only slight to moderate in the target area. There were some fighters seen and a few enemy fighters appeared to be about, but our aircraft had no encounters. With the exception of one, all our aircraft attacked the primary target. "C" (F/O Smith) had trouble with a coolant leak in the port inner engine after feathering it and being able to get above 10000 feet he had to abandon just S.E. of Brussels, jettisoning some of his bombs off the East Coast in the permitted area and landing with the remainder. Owing to the deterioration in the weather only 9 aircraft landed at Base, the remainder landed at Stations in the diversion area.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary, at 16,000 ft at 19.06 1/2

Operation/Target: Aschaffenburg (21 Nov 1944 - 22 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Aschaffenburg 21 Nov 1944 22 Nov 1944 N The Squadron dispatched 26 aircrarft and crews to attack the marshalling yards at ASCHAFFENBURG. The take off at 15.45hrs was good and without incident. Once again the weather denied crews the satisfaction of even seeing the target or assessing results. En route conditions were good, but over France cloud built up and the Master of Ceremonies and his deputy appeared to be going into a "huddle" to decide exactly where the target was. A small break did reveal markers and these were confirmed to be well placed and were bombed. Following aircraft were assisted by a red glow beneath the clouds and several explosions were reported. F/O Stevenson and W/O Hopman with their crews completed there first tour of operations.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 12,000 ft at 19.21

Operation/Target: Freiburg (27 Nov 1944 - 27 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Freiburg 27 Nov 1944 27 Nov 1944 N 31 aircraft and crew were dispatched to attack the town of FREIBURG with its associated rail facilities at approximately 15.45hrs. The target was a small one, only approximately 2 miles by 1 and 1/2 miles, and the attack was entrusted to No. 1 Group to accomplish. With every Squadron putting out it's largest numbers, a new record was accomplished with over 300 aircraft and of these all successfully attacked the primary target, except one which was abortive. 550 Squadron accomplised their best performance to date with 31 aircraft off, 31 attacking the target and 31 aircraft returning to Base. After a smooth take-off and an uneventful journey across Allied held France, our crews found that the P.F.F. had prepared a "bang on" show for them. In spite of considerable thick stratus cloud and base well below, markers were being dropped punctually, and in great profusion while the Master Bomber had his finger "well out" and was giving clear and concise directions with machine gun rapidity. Nearly all our crews bombed on ground markers seen through the haze, although two of them took advantage of sky markers which were also dropped. The cloud base prevented the results from being reported as spectacular as they almost certainly were underneath, but the bombing appeared to be concentrated and a satisfactory fire glow soon developed by the light of which later crews were able to see a large church and streets outlined as the looked obliquely under the large pall of black smoke that soon arose. Flak was light and spasmotic, with no searchlights and none of our aircraft was hit. In fact, what "hit" most of them, was the sight of the lights of the Swiss Town of Basle "Like Piccadilly used to be, I suppose" as one Australian Navigator said, and the misty splendour of the misty Alps in the moonlight.
Postscript message from A.O.C. No. 1 Group: "Last night we operated, in all, 312 aircraft with only one abortive sortie and one aircraft missing. Please give my congratulations to all ranks for this magnificent record, which has never before been approached by any Group. It was a splendid achievement by both air and ground crews. All attacks were highly successful".
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary 12,000 ft at 20.06

Operation/Target: Dortmund (29 Nov 1944 - 29 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dortmund 29 Nov 1944 29 Nov 1944 N 30 aircraft and crew were dispatched to attack DORTMUND. All successfully took off at approximately 11.20hrs, but the weather conditions over the target left much to be desired. Crew reports agree that after a precessional approach through the flak-strewn corridor to the target area, leading sorties arrived somewhat early to find that cloud and haze barred all but a fleeting glimpse of the built-up area and precluded effective pinpointing. The markers appeared to have been widely scatted and the Master Bomber's guidance could hardly have beeen described as inspiring. In the circumstances our sorties endeavoured to bash the bashful marker while others set off in search of built up areas. "C (F/L Maclachlan) and "L2" (F/O Williams) both claim to have bomber red markers. Pressing on, our "E2" (F/O Dale) found himself well past the target area without sighting a worthwhile objective, plain or coloured. Nothing daunted he attacked the centre of Munster and brought back a photograph to prove it. Meanwhile "W" (F/O Adams) losing height on three engines had barely reached the Rhine when prudence counselled an alternative target which he chose at the village of [STEMMELN], where a train on the main line appears in his photo to have had a clean shave. Both these lone wolves brough mementoes of flak opposition at and around their target. All out sorties returned safely, including "P" (F/O Summons) which after colliding with another aircraft en-route to the target, was coaxed on its two port engines alone through a gauntlet of flak towards Dusseldorf. Good airmanship and richly deserved good luck (which unhappily deserted the other victim - an aircraft from a sister Squadron) brought the unfortunate episode to a safe finish for F/O Summons and his crew. Losing height and weaving as much as it dared "P" presented a sitting and solitary target for Jerry's guns. A run was made on a built up area, where in far from ideal conditions the bomb-aimer declared his entire load - minus one bomb-tail - well and truly laid ... a truely remarkable performance, as was disclosed on subsequent inspection of the mangled bomb-bay. Thereafter, losing height on a "Home James!" course, and escorted on the finishing straight by a Spitfire, "P" touched down at Mansten with a dignity that belied its crumpled propellers and disembarked its crew entirely unscathed.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 21,000 ft at 15.00 1/2hrs

Operation/Target: Urff Dam (03 Dec 1944 - 03 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Urff Dam 03 Dec 1944 03 Dec 1944 Y 14 aircraft and crew detailed to carry out an attack on URST DAM and took off at approximately 07.30hrs without incident. The weather en-route was bad and over the target visibility was so poor and the weather so bad that the crews returned without dropping their bombs. Flying training programme was also carried out totalling 33.06hrs.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Abandoned on instructions of Master Bomber

Operation/Target: Karlsruhe (04 Dec 1944 - 04 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Karlsruhe 04 Dec 1944 04 Dec 1944 N 24 aircraft and crew took off at approximately 16.30hrs to attack the town and railway facilities at KARLRUHE. The crews has an uneventful but rather long trip over Allied Occupied Territory and found the target covered with 9/10th cloud. On approach some crews were able to identify the Red and Green T.I.s below cloud, which were rather scattered. The cloud rapidly moved eastwards and some of the later arrivals were able to identify the town visually. From reports it is gathered that good fires were started in the town, the glow of which could be seen for over 100 miles. Opposition from the ground consisted only of slight flak for the most part bursting well below the aircraft. All our aircraft returned safely.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary 19,000 feet at 19.31 hours.

Operation/Target: Merseburg (06 Dec 1944 - 07 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Merseburg 06 Dec 1944 07 Dec 1944 N 30 crews briefed and took their aircraft off at 16.35hrs without incident to attack the synthetic oil plaint at MERSEBERG. The target was the LEUNA chemical works, one of he largest plants in Germnay, covering an area of 1 1/4 sq miles, and employing some 50000 workers in the manufacture of ammonia, fertilisers, chemicals, synthetic oil and other products. Truely a "chemical hot bed". The customary 10/10 cloud again persisted and bombing was carried out on flares. The glow of fires was visible for some distance on the return journey and several explosions were reported. Owing to the density of the cloud photographs proved useless and the report of our P.R.U colleagues are awaited with interest. Flak was reported as being moderate to intense. Little training was carried out owing to the lack of aircraft. From this operation F/L Morris and crew failed to return.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary 17,000 ft at 20.50 1/2 hours

Operation/Target: Essen (12 Dec 1944 - 13 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Essen 12 Dec 1944 13 Dec 1944 N 25 aircraft and crews took off without incident at 16.00hrs to attack ESSEN. The journey out proved uneventful and the 10/10 cloud which greets us with almost monotonous regularity was again in evidence. Early crews saw sky markers up aloft, a situation which gave bomb aimers rather a headache, but aircraft arriving later did not have the same problem to solve and were able to bomb in the orthdox fashion. Observed results were confined to a red glow seen reflected on the underside of the clouds and three healthy explosions each of which lighted the sky for appropimately 30 secs. Photographs were unable to throw any light on the subject and so once again we shall have to await the accurate assessment of the result. Flak was light to moderate and later increased in intensity.
In addition to the operations 20.52hrs flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary 19,000 ft at 19.4

Operation/Target: Ludwigshaven (15 Dec 1944 - 16 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Ludwigshaven 15 Dec 1944 16 Dec 1944 N 30 aircraft and crews took off at approximately 14.20 without incident to attack LUDWIGSHAVEN paying particular attention to the chemical works situated on the northern outskirts of the town and extending for approximately 3 miles to the village of Oppan. There was rather more cloud than expected over the route which compelled many crews to fly and to attack from greater heights than intended. The first wave crews were there even before the first pathfinders target indicators, a number of them therefore bombed on navigational aids or on E.T.A. whilst others orbitted thje target until the markers were dropped. A good deal of early bombing was consequently scattered over a wide area as the markers appeared a very good concentration indeed developed. Last crews reports large fires with great volume of smoke. Several photographs brought back confirm the concentration of fires around the markers but ground detail is not good enough to enable their exact location to be plotted. Flak was reported as being considerable, and searchlights very active. The Squadron were to contribute 20 aircraft for this attack. Soon after take off, two aircraft were seen to be having trouble which it was believed might have prevented completion of the sortie, so both reserve aircraft also took off making the Squadron total 30 aircraft, and all of them carried out successful sorties. F/L Pyke "E" had an engine go u/s on the outward route but pressed on regardless to the target and home on three. A/S/L Redmond "R" could not retract one leg of the aircraft undercarriage after take off, he also completed the round trip with a swinging leg.
S/L Redmond on this trip completed his second tour oof operations.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 17,000 ft at 18.30

Operation/Target: Ulm (17 Dec 1944 - 18 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Ulm 17 Dec 1944 18 Dec 1944 N 29 crews were briefed to attack the rail junction at ULM situated some 100 miles inside the German frontier on the banks of the Danube. Heavy cloud compelled low flying for most of the way, but in the target area there was little more than thin stratus which did not prevent ground markers from being seen through it. The Master Bomber' assessment of the situation however was that the best results were likely to be produced from aiming on the well placed and plentiful sky markers and ordered bombing accordingly. A very good concentration of fire developed, with a number of spectacular explosions occuring among them. Defences were meagre and there were no searchlights active.
S/L Caldow "B" was unlucky - one of the few flak bursts over the target hit one of his aircrafts fuel tanks, which promptly emptied, the tailplane, elevators damaged and one of the aerials shot away which did not interfere with a safe return and landing at Base. No flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Abortive - Both Generators u/s

Operation/Target: Koblenz (22 Dec 1944 - 22 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Koblenz 22 Dec 1944 22 Dec 1944 N 24 crews were briefed to attack the communications centre at KOBLENZ and 20 took off at approximately 15.15 hours in fog which had been with us for days. The visibility at its best was 300 yards. F/Lt Shaw "E" was the first to take to the air and the remainder of the boys decided that if a Scotsman could get off so could they. The 20 aircraft successfully took off, four aircraft were cancelled as the visibility became really impossible. It appears that other stations in the base were not so badly handicapped by weather conditions as was Killingholme, and it is considered that the Squadron did well to get 20 aircraft off the deck. No trouble was experienced on route and all aircraft arrived at the target area with the exception of "H" (F/O Franklyn, J) who had to return from France with a Port Outer Engine unserviceable, and was diverted to R.A.F. Croft. At the target 2/10 to 4/10 thin cloud experienced, the sky marking was a few minutes late, but enough flares were dropped to enable most of the crews to bomb them. Some crews caught momentary glimpses of the two rivers standing out from the snow covered ground and there were opinions that the attack fell slightly south of the aiming point. This is confirmed by photographs brought back. The defences were quiet, flak being described as slight with no searchlights operating. Whilst the aircraft were on their journey, visibility at Base had deteriorated still further and all our aircraft were diverted to Woodbridge and all landed safely. "K" got down at Mildenhall and "Q" at Langham. Flying through the twin flame lanes of the fog dispersal apparatus one Australian gunner was heard to say that it was the first time he felt really warm in this country. No flying training was undertaken.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary, at 19,000 ft at 18.59 hrs.

Operation/Target: St. Vith (26 Dec 1944 - 26 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
St. Vith 26 Dec 1944 26 Dec 1944 N The Squadron was called upon to operate, but with the majority of the Squadron still grounded at Wendling, and presumably nursing an Xmas "hangover", all the Squadron would offer was nine aircraft in an attack called from all groups on the railhead town of St. Vith, just inside Belgium on the northern side of the German advance, and was being used as a re-training centre for Panzer troops from rearward areas. Visibility was still in the visinity of 600 yards at the time of take off, but improved over the North Sea. The Continent was free from cloud and in spite of slight haze, visibility was good and the crews were able to map read and identify the target visually with ease. An excellent concentration of bombing was achieved, two large explosions were noted, one in the town and one on the railway to the N.E. Opposition was negligible except from positions behind the enemy lines on the run up to the target. No trouble was experienced from enemy fighters. Photographs brought back were excellent and showed a good concentration of bombing. F/O Williams brought back a "gem" of a photo which was enlarged for the Commander-in-Chief to see. All aircraft were diverted to R.A.F. WALTHAM.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary, at 10,000 ft at 15.32 1/2 hrs. F/L G T Pyke (P)
Sgt D Hellings (Nav)
Sgt D Peters (A/B)
Sgt L Adams (W/Op)
Sgt D S Eldred (MU/AG)
Sgt A T Ellement (R/AG)
Sgt H D Davies (F/Eng)

Operation/Target: Rheidt (27 Dec 1944 - 27 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Rheidt 27 Dec 1944 27 Dec 1944 N 9 aircraft which had been diverted to Waltham and Ludford Magna took off from their diversion stations to attack the marshalling yards at RHEIDT, lying as it does to the west of the Ruhr and Rhine, this centre is vitally important at the moment to the Hun for conveying his troops and materials from the Ruhr and Central Germany. Shaking off the fog the crews found the French Coast and Continent clear except for slight ground haze. The target was easily identified in good visibility and the first T.I.s cascaded on the northern end of the marshalling yards followed by others which were "dead on" the aiming point. The bombing thus was very concentrated and accurate, the target soon became enveloped in smoke, rising many thousands of feet in the air. One particularly large explosion was seen in the marshalling yard, possibly ammunition waggons. Flak was negligible over the target, but some aircraft were engaged by heavy flak north of the target. No enemy fighters were seen. On the return the weather was still in its "pranky" mood and all aircraft were again diverted, this time to Finningley. No flying training was carried out from Base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary, at 20,000 ft at 15.00 hrs. F/L G T Pyke (P)
Sgt D Hellings (Nav)
Sgt D Peters (A/B)
Sgt L Adams (W/Op)
Sgt D S Eldred (MU/AG)
Sgt A T Ellement (R/AG)
Sgt H D Davies (F/Eng)

Operation/Target: Scholven-Buer (29 Dec 1944 - 29 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Scholven-Buer 29 Dec 1944 29 Dec 1944 N 22 aircraft with crews took off without incidient at 15.00 hours to attack synthetic oil plants at SCHOLVEN-BUER approximately 7 miles north of Gelsenkirchen. At the target 10/10 thin cloud was met but this did not, however, prevent the target indictators from being well seen. Bombing quickly became concentrated round the markers, and almost immediately a very large explosion was seen, and resulted in thick columns of black smoke rising through the clouds. Several good fires developed and explosions were continuous until the last aircraft left. The defences of Cologne, Bochum, Gelsenkirchen and the Essen district were very active but not over the target itself. Cloud prevented ground detail coming in the photographs brought back, but in many of them, the fires and explosions show most encouragingly. It is thought that the attack was a success and all aircraft returned safely to base. No flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary, at 17,000 ft at 18.59 1/2 hrs.

Operation/Target: Osterfeld (31 Dec 1944 - 31 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Osterfeld 31 Dec 1944 31 Dec 1944 N 14 aircraft were dispatched from the Squadron at 15.00 hours to assist in the attack on OSTERFELD marshalling yards on the northern end of the Ruhr. The journey outward was uneventful, except that adverse winds from the north speeded up considerably more than forecast, and gave the navigators a lot of hurried extra work to do. On the final "run-in" to the target the aircraft were travelling at something like 350mph ground-speed - "that's 550 that was" - the bomb aimers had to look slippy and "pull their fingers out". The weather at the target was 10/10 fairly thin cloud, thin enough for most bomb-aimers to get a reasonable view of the markers which were in fair supply. Most crews bombed them, only two being forced to rely on navigational aids. Reports of the attack varied from "good" to "disappointing". However, encouraging confirmation came along in the shape of photographs showing sticks right across the marshalling yards and the T.I. streaks also well placed. Flak was again reported as slight and spasmodic, some crews even stated that they had experienced no flak wahtsoever throughout the entire journey through the Ruhr, which is incredibly amazing - however they should know! Eleven hours flying training was carried out during the day and night.


So ends the year 1944, with a good job behind us, and a better and we hope, a final job ahead of us. Come what may 550 is always ready for the fray.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 19,000 ft at 18.53 F/O G E Blackler (P)
Sgt W R Ross (F/Eng)
F/Sgt H P Nichols (Nav)
F/Sgt J W Bold (A/B)
F/Sgt E Mozley (W/Op)
Sgt J Nicholson (MU/AG)
Sgt M McCutcheon (R/AG)

Operation/Target: Nuremburg (02 Jan 1945 - 02 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Nuremburg 02 Jan 1945 02 Jan 1945 N 29 aircraft with crews, plus 2 crews and aircraft from No. 166 Squadron, were briefed to attack Nuremburg. Thirty aircraft took off at approximately 15.00 hours without incident. F/O Summons failed to take off owing to his navigator having met with an accident whilst proceeding to the aircraft. Also one complete crew was sent to R.A.F Elsham Wolds and took off from there to participate in the operation for No. 103 Squadron. The crews found the weather to be cloudy over England, and the Channel, and the Continent as far as 700degrees[???] East. From thence it gradually cleared and at the target conditions were excellent with only a slight ground haze and the built up area contrasted sharply with the snow covered countryside. Owing to the prevailing winds, aircraft arrived early in the target area and some aircraft orbited awaiting the Pathfinder marking. The attacks opened a few minutes early and the first ??? of mixed Red and Green Target Indicators were seen to fall across the Marshalling Yards in the [???] of the town. Excellent concentrated bombing developed, numerous explosions took place, and the glow of the raging fires could be seen 150 miles away by the crews on their return journey. A reconnisance aircraft flying over the target after the attack reported three large area of solid fires to the N.N.W. and one to the S.E. with many smaller ones over the whole area. One aircraft "E" (F/O Smith) developed an oil leak in the port inner engine whilst over France. Correctly following instructions he sought out and found an alternative target, that of the town of Pforsheim, some 25 miles north of the route, lying between Karlsruhe and Stuttgart. The ground defences consisted of slight heavy flak and numerous searchlights, but all ground opposition rapidly decreased as the attack developed. Excellent photographs brought back prove conclusively that the attack was excellent. No flying training was carried out owing to the aircraft being used for operations, but a programme of ground training was carried out by the crews not engaged on operations.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 16,000 ft at 19.31 hrs.

Operation/Target: Hannover (05 Jan 1945 - 06 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Hannover 05 Jan 1945 06 Jan 1945 N 24 aircraft with crews took off at approximately 19.00 hours to attack HANOVER. The weather was nowhere difficult on route and our crews were led visually to the target by means of it's "Blaze of Glory" that could be seen for a hnudred miles, this blaze had been started by an earlier attack two and a half hours before by [unreadable]. Our attack was to impede the fire fighters and add more fuel to the fires. The [???] was blazing beautifully and the second installment of H.Es and incendiaries was added to the [???]. Fires and smoke increased and could be seen by our crews when over the Zuider Zee on their return. Good photographs were brought back. Flak was reported generally as moderate, but accurate for height and there was searchlight activity, although with the glare of Recc. flares above and the fire glow below they had a pretty thin time. The attack was an outstanding success and Hanover now has a hangover. One of our aircraft "M" (F/O Adams) and crew failed to return, no news being received after take-off. They were a grand team and will be missed by all on the Squadron. A good flying training programme was also carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 21,000 ft at 21.55 hrs.

Operation/Target: Munich (07 Jan 1945 - 08 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Munich 07 Jan 1945 08 Jan 1945 N 27 aircraft and crews, which included 2 base reserves, were required on operations and the crews were briefed to attack MUNICH. Owing to three aircraft going unserviceable at the last moment, only 24 aircraft took off at approximately 18.00 hours. Nil to 6/10 cloud tops at 10,000 ft was encountered over this country and the English Channel. A front was positioned just inside the French coast and cloud was 10/10 with tops up to 20,000 ft to approx 5 degress E; from there to 7 degress E, the cloud was thin and a certain amount of icing was experienced, but after crossing the Rhine the cloud once again became 10/10 and the target was completely obscured by fairly thick cloud with tops 10/12000 ft. Owing to stronger winds than forecast the main force arrived early in the target area and many orbited or dog-legged while waiting for markers. Aircraft from No. 5 Group had preceded our attack by several hours and what appeared to be the glow of fires and searchlights illuminating the cloud base could be seen for approximately 40 miles on appreoach to the target. The 5 group attackers experienced more favourable conditions and a concentrated and accuruate bombing appeared to have taken place. For our attack, the markers were sparse. The target indicators rapidly disappeared into the cloud and it was not until 22.33 hours that any degree of concentration of sky marking was achieved; many crews had bombed before this. The concentration of marking was not maintained and the attack can only be regarded as somewhat scattered. No detailed results were observed. Ground defences in the target area consisted only of slight to moderate heavy flak. Stuttgart defenders were active and several combats with night-fighters were reported. All photographs show cloud, therefore no assessment of the attack could be made although from the H.2.S. fixes there can be no doubt that the attack was correctly centered more or less on the centre of the city. F/O Ansell and crew completed a very successful tour with this trip. F/O Clarke ("P") and crew failed to return, nothing having been heard from them after take-off.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary, at 17,000 ft at 22.30

Operation/Target: Leuna Oil Plant (14 Jan 1945 - 15 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Leuna Oil Plant 14 Jan 1945 15 Jan 1945 N After a week of enforced flying inactivity, the Squadron stood by for operations with 30 crews of which one complete crew was sent to R.A.F. Station, Kirmington and one to R.A.F Station Elsham to make up operationally fit crew members on these stations. F/O Cameron departed from the Squadron on posting to No. 1656 Heavy Conversion Unit, Lindholme, as an instructor. F/O Cameron had completed a very successful tour with the Squadron and was very popular with all members of the Squadron, who regret his going.
27 aircraft took off at approximately 19.00 hours to attach LEUNA synthetic oil plant near Merseberg. "N" (F/O Parsons) proved abortive owing to the unfortunate illness of one of the crew and returned to Carnaby. The remaining 26 "pressed on regardless", led throughout by the indefatigable "F" Fox. The captain F/Lt "Jock" Shaw has at last been compelled to call it a day with a grand total of 42 operations. Higher authority this time refused his application to continue on Ops much to the disappointment of Jock. The weather on route was fairly good but deteriorated at the target to 10/10 cloud. Bombing was by sky-markers and conditions prevented results being observed. Defences were active. None of our aircraft were damaged and returned safely to base. Flying Officers Harris and George completed their first tour of operations without a single abortive. No flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 22,000 ft at 23.58 hrs.

Operation/Target: Zeitz Oil Plant (16 Jan 1945 - 17 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Zeitz Oil Plant 16 Jan 1945 17 Jan 1945 N 26 aircraft 2 reserve aircraft and crews stood by for operations. The crews were briefed and 28 aircraft took off without incident at 17.30 hours to attack the synthetic oil plant at ZEITZ, situated some 20 miles south of Leipzig. "E" (F/Lt Pyke) had a somewhat "dicey do" soon after take off and while climbing over base the port outer engine caught fire; unable to extinguish it or feather the airscrew, F/Lt Pyke proceeded out to sea to jettison his bombs and do it quickly as the fire threatened to get out of hand. However, all went well for the fire went out soon after recrossing the coast and landed safely. The weather was as per forecast and gave no trouble. On arrival at their distant target they found clear weather and good visibility. The bombing was highly oncentrated on the centre of the target. 9 major explosions and one really super explosion which belched forth flame and black oily smoke were seen, The crew were really enthusistic and highly satisfied with their night's work. The defences and night fighters were very active, but all returned safely to base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary, at 17,500 ft at 22.17 hrs.

Operation/Target: Hamborn (22 Jan 1945 - 22 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Hamborn 22 Jan 1945 22 Jan 1945 N 27 aircrews were briefed at 08.45 hours and were in thair aircraft ready for action. The Squadron was to be led by the Station Commander G/Cpt McIntyre, but the intended operation was once again cancelled owing to adverse weather en route and over the target. Needless to say the boys were very disappointed for they all, without excpetion, thoroughly enjoy a daylight operation. A good training programme was laid on but had to be cancelled owing to the Squadron having to prepare for another operation for which 31 aircrews were briefed at 14.30 hours and successfully took of at approximately 16.45 hours. Although take off was good, it needed all the pilots skill to successfully accomplish the feat. The runways were on the treacherous side in spite of the amount of time and effort spent on clearing snow and spreading salt and sand. Watching take off my heart momentarily stood still a few times, severlal aircraft when about to become airbourne had a tendancy to swing sharply to starboard which looked decidedly dangerous.
The Squadron was led by Squadron Commander W/Cdr Bryan Bell (Dingle) to attack the steel works at HAMBORN, the northern suburb of Duisburg. F/Lt Summons in "Q" returned early with C S U(?) trouble, but the remaining 30 had a very successful party. The target was clear of cloud, the marking was accurate and bombing concentrated. Several fires were started and explosions reported, one very impressive and 37 minutes after "N" hours. At the end of the attack the target was covered by a thick pall of smoke. Ground opposition was only slight and fighters little in evidence. All returned safely and unscathed to Base. Photographs brought back show excellent results. F/Lt Shenker and F/O Bell with their crews completed their first operational tours on the high note of this most satisfactory operation.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Abortive - starboard inner, C.S.U u/s F/O D W Summons (P)
Sgt C C Jerman (F/Eng)
F/L G S Nankivell (Nav)
F/O A Benger (A/B)
F/Sgt J W Arnold (W/Op)
W/O J J Boland (MU/AG)
Sgt J F O'Halloran (R/AG)
F/L C M Irving (P)

Operation/Target: Mannheim-Ludwigshafen (01 Feb 1945 - 02 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Mannheim-Ludwigshafen 01 Feb 1945 02 Feb 1945 N After 10 days of enforced idleness due to excessive weather conditions the Squadron was called up on to supply 29 aircraft and crews plus two aircraft and crews in reserve to attack the rail centre and marshalling yards in LUDWIGSHAVEN. 30 aircraft successfully took off at approx. 1530hrs The weather on route was rather mixed from 10/10 cloud to clear conditions over the Channel well broken cluid over the Continent until the target 10/10 cloud built up about 5 miles hort on the run in. On the return very turbulent conditions were encountered crossing the North Sea to the Norfolk Coast. At the target both ground and sky marking was resorted to by the PFF but with the target indicators disappearing into the low cloud and some of the sky markers being too high for easy aiming, bomb aimers had rather a difficult time. Results were very obscure, there was however a very encouraging incendiary glow that developed into a compact fire mass with two explosions. From the H2S photographs brought back, it is thought that there was a tendency to undershoot. Flak was reported as slight, later decreasing to give way to night fighter activity. Night fighters were more active than usual and several combats were observed.
F/L Maltin and his crew completed their second tour and F/L Doward and his crew completed their first tour of operations successfully. F/O Lohrey and his crew failed to return and it was at first reported as missing but later it was learnt that at least five of his crew, including himself, were safe in Allied Territory, after having been forced to abandon their aircraft which had been badly damaged colliding with a friendly aircraft near the target area.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned -

Operation/Target: Weisbane (02 Feb 1945 - 03 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Weisbane 02 Feb 1945 03 Feb 1945 N 28 aircraft and crews were accepted and briefed to attach WEISBANE where enemy troops were reported to be resting and being re-fitted preparatory to a move to the Eastern Front. Of the 28 aircraft, only 26 aircraft took off, 2 aircraft were non-starters owing to one developing engine trouble and the other being bogged due to a temporary failure of some perimeter track lighting. The weather again was our chief enemy. Cloud up to 20,000 ft had been predicted over the Channel only, but in point of fact the worst conditions were over the target where there was layer cloud up to this height and over. Markers were completely obscured and in the circumstances it hardly seems likely that a concentrated attack could have been made. Flak was very ineffective but three of our aircraft saw enemy fighters and opened fire on them without response or conclusive result. All our aircraft returned safely one landing at Kirmington.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary, at 20,000 ft. at 23.55 hrs.

Operation/Target: Kieve (07 Feb 1945 - 08 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Kieve 07 Feb 1945 08 Feb 1945 N 27 aircraft and crews were the Squadrons contribution to an attack on KIEVE a road centre where six routes meet, also a rail junction linking the Ruhr and those area still held by the Hun in Holland north of the Rhine - the object being to blot out the town, thus denying the enemy the main route into that part of the battle area. All aircraft successfully took off without incident in the usual Squadron style at approximately 18.30hrs. F/L Pickles in "Y" very reluctantly had to abandon his mission when over France owing to his bomb sight being unserviceable. F/L Rhude had the galling experience of going all the way to the target and then found his bombsight u/s. He made the correct decision, refrained from bombing and brought his bombs back. The route to the target was practically cloud free but the target ware was covered by 9/10-10/01 cloud about 3000 ft thick. The Master Bomber had the matters well organised and brought the main force down beneath the cloud where they found the ground marking concentrated and easy to follow. The crews were unanimous that the bombing was very concentrated with "cookies" bursting all around the markers. Flak was negligible only a few spasmodic bursts being observed.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 5,000 ft at 22.13 hrs.

Operation/Target: Politz (08 Feb 1945 - 09 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Politz 08 Feb 1945 09 Feb 1945 N The Squadron stood by for a skylight operations, which was however cancelled at approx. 13.30hrs presumably owing to adverse weather. 28 aircraft were later called for an attack on a synthetic oil plant at POLITZ 3 miles north of Stettin. Owning to mechanical defects developing at the last moment only 24 aircraft took off at approx. 19.00hrs. The weather along the unfamiliar route fufilled our worst suspicions, but on approaching the Reich the waether improved considerably and the target area was found to be practically free from cloud, consequently the flares and markers were dropped punctually and accurately. The target had been attacked two hours earlier and the fires started were still visible and our boys brigthened them up considerably. Many explosions were seen and a particularly vicious one at 23.17hrs which lit up the whole area and was said to have been the best ever. All our aircraft returned safely although one, F/O Parsons in "N" landed at Carnaby with defective hydraulics. Good photographs were obtained. F/O Lohrey and four members of his crew who baled out after their attack at Ludwigshaven on the 1st Feb returned to the Squadron.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 13,000 ft at 23.16 1/2 hrs

Operation/Target: Dresden (13 Feb 1945 - 14 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dresden 13 Feb 1945 14 Feb 1945 N 27 aircraft and crews were called upon for operations, 28 crews were briefed, one extra being held in reserve. After some effort 26 aircraft took off at approximately 21.15hrs to attack DRESDEN. The journey across England was unfortunately marred by a fatal accident in which one of our aircraft was involved (B2 - F/L Allen). It appears that an aircraft from 300 Squadron collided with ours near Appe by Manor Lincs, soon after setting course and the wreckage of both planes was scattered over a wide area as a result of explosions.
The weather en-route was better than expected. After a long journey across the continent the target was seen some 180 miles before E.T.A looming up as a dull red glow of fires still raging from a previous attack. The Bombing run was clear which enabled the crews to see the markers and a further concentrated contribution of cookies and incendiaries again made the rear reflecting against the clouds, warming the hearts and feet of the rear gunners. The defences protested, but it was only a feeble attempt. Photographs show an encouraging quantity of fire and incendiary glare and in short show that the attack was a highly successful one.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 17,000 ft at 01.36 1/2 hrs

Operation/Target: Dortmund (20 Feb 1945 - 20 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dortmund 20 Feb 1945 20 Feb 1945 N 27 aircraft and crews took off without incident to attack once again the heavy engineering manufacturing town of DORTMUND. F/O Ferguson in "L" unfortunately returned early with his starboard inner engine u/s. The remaining aircraft found good weather along the route until approx. 0530 degress E when a low layer of thick cloud gradually built up to 4000 feet, until at the target the markers were barely visible as they dropped into it. The marking was punctual and an adequate number of ground markers, as well as some sky markers were dropped, However, the latter were somewhat scattered and although some encouraging concentrations of incendiary and fire glows were seen indistinctly under the cloud, the illuminating explosions, there was quite a lot of scatted bombing and it must only be considered, from first accounts, as a moderately successful raid. Ground defences were reproted as being only slight to moderate in a loose barrage, with one or two aircraft receiving some predicted attention. Night photographs show a good diplay of incendiary and fire tracks, but clouds have again prevented only plotting. Good shows were put up by F/O Franklyn in "G" who had his port outer engine u/s and had to feather it when over the Bexhill area on the outward journey. F/L Dale in E2 (taking F/L Sarll and crew on their initial operation) had trouble with his port outer engine which was u/s from 0500 degrees outward forcing them to bomb at 13,000 feet. F/O Mearns also had trouble with his starboard outer engine which was partially u/s for the trip.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 21,000 ft at 01.11 hrs

Operation/Target: Duisburg (21 Feb 1945 - 21 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Duisburg 21 Feb 1945 21 Feb 1945 N [Ed: Target not listed in ORB. Duisburg assumed.] 24 aircraft and crews were detailed and all took off, including "B" (F/L Sarll) whose first independant trip was made with the rear turret u/s. The operations had an unhappy end in the failure of "A" (W/C Bell with the F/L Luger and his crew) to return to base. Everyone will be sorry to lose W/C Bell whose cheerful, forceful personality has been an inspiration to all members of the Squadron and Killingholme generally. It is feared that this layer cloud over the target marred the accuracy of the attack. Marking was punctual, but reports such undershooting, there were, however, large fires and several explosions around the aimers points. Flak at the target was only slight to moderate, fighters on the other hand were much in evidence, "A" F/O Smith the only aircraft to report a combat can claim a suspected ME262 as probably damaged. Owing to the thin cloud none of the photographs succeeded in showing ground details. Congratuations to F/L Harris and crew on the completion of a voluntarily extended tour, without an abortive.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 18,000 ft at 23.19 hrs

Operation/Target: Pforzheim (23 Feb 1945 - 24 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Pforzheim 23 Feb 1945 24 Feb 1945 N 27 aircraft and crews were called for to attack PFORZHEIM and took off at approx. 16.00hrs without incident. Weather at take off was 10/10 low cloud down to 600 ft, but broke up over the continent and the target was quite clear, with some "dangerous moonlight". The markers were accurately placed and the bombing was correspondingly concentrated and the attack has every appearance of being a hightly successful one, fires could still be seen 150 miles away on the homeward journey. Very slight light flak was encountered over the target but night fighters were much in evidence. "C" (F/O Grundy) failed to return from this operation. F/O RD Harris in [NF998] despite a damaged port outer engine which caught fire over the target and severed tube caused by incendiaries, limped back and landed at Manston. One of the crew was injured but not seriously.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 9,000 ft at 20.04 F/O R P Franklyn (P)
Sgt S Dennis (F/Eng)
F/Sgt R H Lucas (Nav)
F/Sgt J A Dibley (A/B)
F/Sgt R J Chester (W/Op)
Sgt K Sharp (MU/AG)
Sgt P J James (R/AG)

Operation/Target: Meuss (28 Feb 1945 - 28 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Meuss 28 Feb 1945 28 Feb 1945 Y 27 aircraft and crews were detailed and took off without incident at approximately 08.00hrs to attack the railway centre at MEUSS and the river unloading port on the Western Bank of the Rhine just opposite Dusseldorf. The crews had been in the air little more than an hour when they were recalled. The operation was cancelled due to forecast cloudy conditions over the target area and the close proximity of our troops The boys were very disappointed to not be able to strike again at the common enemy.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Recalled

Operation/Target: Mannheim (01 Mar 1945 - 01 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Mannheim 01 Mar 1945 01 Mar 1945 N 26 aircraft with their crews took off at approximately 11.30hrs without incident to participate in a daylight attach on a large concentation of enemy troops reported to be in the vicinity of the Rhine bridgeheads near MANNHEIM. It was unfortunate that on this daylight raid the target was covered by 10/0ths could and results of our bombing could not be observed and assessment of the raid was not possible. Ground defences consisted of approximately a dozen bursts of heavy flak. The bombers were escorted by fighters who kept their opposite numbers out of sight. "K" (F/O Davidson) had a starboard outer engine catch fire and although losing height pressed on to the target bombed and returned safely.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary, at 18,000 ft at 15.08 1/2 hrs.

Operation/Target: Cologne (02 Mar 1945 - 02 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Cologne 02 Mar 1945 02 Mar 1945 N 26 aircraft with their crews took off at approximately 06.45hrs in the usual Squadron style to attack the approaches to the Rhine bridges at COLOGNE to prevent the retreating Huns from escaping to the east of the Rhine. For once the weather was kind. 5/10ths cloud was encountered until approximately 20miles short of the target which was clear. Visibility was good and crews had no difficulty in identifying the aiming point visually. Bombing was reported to be concentrated with a few hundred yards of aiming point. A generous fighter escort was supplied which discouraged the Luftwaffe from putting in an appearance. Flak over the target was moderate and accurate. Five aircraft from the Squadron were damaged. Photographs confirm that the aiming point was well and truly hit.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary, at 16,000 ft at 10.01 hrs. F/O J E Franklyn (P)
Sgt L D Dale (F/Eng)
F/Sgt W Hill (Nav)
Sgt W D Braham (A/B)
F/Sgt M Gillespie (W/Op)
F/Sgt H J Day (MU/AG)
Sgt S G Dyer (R/AG)

Operation/Target: Chemnitz (05 Mar 1945 - 06 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Chemnitz 05 Mar 1945 06 Mar 1945 N 26 aircraft, including the reserve, as it was apparant immediately after take-off that "E2" (F/L Dale) would be abortive with a port engine unserviceable, took off at approximately 16.45hrs as part of a force of over 700 Lancasters and Halifaxes detailed to attack CHEMNITZ. The trip to the target was without incident, with a layer of 10/10 cloud beneath most of the time. On reaching the target area it was quickly seen that the cloud prevented anything other the sky marking which was called for by the Master Bomber. His broadcasting was much distorted by static interference, but he was generally heard. The first release point flares went down 3 minutes before "H" hour; they were plentiful and well grouped but fell into the cloud tops rather quickly and later there was a gap when no flares were seen. Detailed results could not be seen but judging from the incendiary glow and the bursts of the cookies, bombing appeared to be concentrated. There was only very slight heavy flak over the target area, but the Leipzig defences were active and the night fighters were in evidence, both over the target and along the first two legs of the homeward route. Three aircraft reported combats but none claimed any night fighters destroyed. 22 aircraft landed safely at base; "J" (P/O Findlay) landed at Benson, "O" (F/O Harris) at Carnaby, with flaps unserviceable, and "F" (F/S Wilson) at Tempsford, with damage sustained in combat but no casualties.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 16,000 ft at 21.49 1/2 hrs

Operation/Target: Dessau (07 Mar 1945 - 08 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dessau 07 Mar 1945 08 Mar 1945 N 27 aircraft took off at approximately 17.00hrs on operations, but not without incident. "E2" (W/O Lukies) proved most fractious. The starboard outer engine cut on take-off. The aircraft swung dangerously but the pilot by masterly handling avoided a hanger and other obstacles, proceeded to the jettison area and returned safely. The other aircraft set course on the long route to DESSAU. Cloud amounts variable. Opposition was lively, both from flak and night fighters, but the former was not so strong over the target. Some crews bombed ground markers through 3/10 cloud with a clear view of the town and River Elbe; others had to rely on sky markers owing to 10/10 cloud. General opinion was that the attack was well concentrated and that the target was set, well and truely, ablaze. "M" (S/L Pickles) had it's "Gee" unserviceable from Southern England outwards, but the crew pressed on and after some meandering found themselves near to the target. They bombed in solitary state, a healthy concentration of fires left by their comrades. Two crews reported inconclusive combats with night fighters. Three aircraft "V" (F/O Jones), "O" (F/O Harris) and "R" (P/O Nielson) failed to return and it was with deepest regret that they were reported missing. Nothing was heard from any of them after take-off. Three aircraft and crews carried out flying in training involving over 7 hrs flying.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 15,200 ft at 22.01 hrs F/L C A Rhude (P)
Sgt P D Fitzgerald (Nav)
F/O C D Goughnour (A/B)
Sgt D A Blyth (W/Op)
Sgt C G Falliur (R/AG)
W/O R E Vietheer (MU/AG)
Sgt W M Kennedy (F/Eng)

Operation/Target: Kassel (08 Mar 1945 - 09 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Kassel 08 Mar 1945 09 Mar 1945 N The Squardon was again called to operate and 23 aircraft took off in quick time without incident at approximately 17.20hrs. The target was Kassel. All the aircraft bombed the primary target indicated including "H" (F/O Cowper) whose port inner engine caught fire and was feathered some 200 miles short of the target. 10/10 cloud covered practically the whole of the continental route, but was broken immediately over the target, which was clearly visible through only a thin layer. Bombing was heavily concentrated, the incendiaries tooks a firm hold and the resultant fire glow could still be seen when aircraft were crossing the Rhine over 100 miles away. Flak over the target was light to moderate and there was little sign of fighter activity - a happy contrast to the previous night's experience. All the Squadron's aircraft returned safely to base, where at interrogation the crews were sleepy but satisfied. One aircraft and crew completed a night flying training drill lasting 2 3/4 hrs
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 20,000 ft at 21.37 hrs

Operation/Target: Essen (11 Mar 1945 - 11 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Essen 11 Mar 1945 11 Mar 1945 N 20 aircraft and crews detailed and took off without incident at approximately 11.40hrs on a daylight sortie to Essen, now only some 14 miles ahead of our troops. A total of over 1000 aircraft took part in the attack delivering over 4500 tons of bombs. There was a level carpet of 10/10 cloud all the way out, over the target and back. Crews bombed on coloured smoke puffs assisted by verbal instructions form the Master Bomber. It was considered that the bombing was quite concentrated and very soon a protuberance in the shape of mushrooming fire smoke appeared, agitating the top layers of the cloud - evidently someting was burning down under. Flak was not very troublesome, being variously described as "nil", "very slight" and "slight to moderate". The Luftwaffe was absent. All the aircraft returned safely to base. 7 aircraft and crews carried out flying training to the extent of 24 3/4hrs flying. Day and night practice bombing, fighter affiliations and Y cross countries.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 Returned Primary at 18,500 ft at 15.03 hrs

Operation/Target: Misburg (15 Mar 1945 - 16 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Misburg 15 Mar 1945 16 Mar 1945 N Another oil target. The Squadron offered 19 aircraft and all took off without incident at approx. 17.10 hours. Most of the "incident", in fact, came before take-off when the CO provided entertainment for the crews whiling away the last few moments on the deck by chasing away a horse which was contravening Station Standing Orders by appropriating one of the runways as a cantering area. After a breathless 10 min exhibition, almost a rodeo, of horse steering by car, the take-off proceded. Except for the English Channel, the route was cloudless and over the target only ground haze was present. Ground identification was possible for many of the crews in the light of the illuminating flares, but ground markers were accurately placed and in excellent concentration. Almost immediately after the first bombs were dropped the target was enveloped in flame and smoke which rose to 10000 feet from a particularly big explosion. An excellently concentrated attack developed, large fires soon became established and two further large explosions occurred. The glow from the first would be seen upwards of 100 miles on the return journey. Opposition from the ground was generally described as moderate heavy flak, although this was accurate for the height and early crews found it hotter than those succeeding them. Some fighters were active but none of our aircraft reported combats, all returned safely to base.

[Ed: this last part of the last sentence appears to be an error in the monthly summary in the ORB. Because on the battle order list for the date one aircraft is listed as failing to return to base: P/O Wallace RNZAF crew, NG287 "Q" (5 killed, 1 Evd, 1 PoW). This was the first op for the Wallace crew since joining the squadron.]
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG287 FTR Missing - no news after take-off. F/O R F Wallace (P)
Sgt W Field (F/Eng)
Sgt H J E Brownett (Nav)
F/O R W Stephens (A/B)
Sgt G B C Capon (W/Op)
Sgt R H Laney (MU/AG)
Sgt I F Tait (R/AG)

Summary Statistics

Based on the data in the lists displayed above, and keeping in mind that data is still being updated and thus not yet complete, the following statistics are generated:

Aircraft Deployment Statistics


Aircraft deployments 39
MAX Aircraft deployed
in single operation
1
(Gelsenkirchen, 06 Nov 1944)

These details were last updated: 05 December 2024


Note

this list is still being built and will take some time to complete
what is currently displayed is believed accurate but much more is still to be added

This note describes the options currently available to produce a smaller, more manageable list and also describes planned future enhancements to the reporting facility.


Return to the top of the page.